People brace for a data quality assessment as though it were an audit, which tells you something about how the sector talks about data. The expectation is that someone will be caught. In practice, deliberate falsification is rare, and when it appears it is usually a symptom of a target regime that made honesty expensive.
What a DQA actually finds, nearly every time, is more mundane and more fixable.
Four findings, in order of frequency
- Definitional drift. Two offices counting the same indicator differently, both in good faith, because the definition lived in a training session in 2023 rather than in a reference sheet. This is the single most common finding and the most consequential, because it silently corrupts every aggregate the programme reports.
- Form design doing the damage. A required field with no "not applicable" option teaches enumerators to enter a plausible value. A default that is already selected gets accepted. A skip pattern that is slightly wrong quietly removes a subgroup from your data. The form is a research instrument and it deserves to be piloted like one.
- Reconciliation gaps. The register, the tracking sheet and the report disagree, and nobody has looked at all three on the same day in six months. Spot checks find this instantly and routine reporting never will.
- Timeliness masquerading as completeness. Data arrives, but three weeks after the decision it was meant to inform. The number is accurate and useless.
Run it as improvement, not inspection
How a DQA is framed determines what it is able to see. Announce an audit and you will get a prepared site: tidy registers, the problems moved out of sight, and nothing learned. Announce a joint exercise to find out where the system is making people’s jobs harder, and field officers will tell you about the broken skip pattern within twenty minutes, because they have been working around it for months and nobody has asked.
The most valuable thing in a data quality assessment is usually the sentence that begins "we always have to...". That is a workaround, and a workaround is a design fault with a human being absorbing the cost.
Close the loop or do not bother
A DQA that produces a findings table and no corrective action log is theatre, and worse than nothing, because it teaches everyone involved that the exercise is performative. Each finding needs an owner, a date, and a check at the next visit. Five findings closed is a better result than twenty findings listed.