MERL system design

Why your logframe has 42 indicators, and what to cut first

Indicator bloat is not a measurement problem. It is an unresolved disagreement about who the system is for.

Berean MetricsJanuary 20276 minute readBerean Metrics Consultancy

Nobody sits down and designs a 42-indicator monitoring system. It accretes. A donor adds three indicators at contracting. A technical adviser adds two more after a field visit. A previous MERL officer adds a handful that were useful once, for a question that has since been answered. Nobody is ever given the authority to remove one, because removing an indicator looks like caring less, and so the list only ever grows.

The cost is rarely counted. Our rule of thumb, from a decade of watching country offices report against global frameworks, is that each routine indicator costs a field officer somewhere between two and six hours a month once you include collection, verification, entry, correction and the email thread about why two offices reported different numbers. Multiply that by 42 and by every site, and you have bought a second job for people you hired to deliver a programme.

Sort by decision, not by importance

The common triage instinct is to rank indicators by importance. This does not work, because every indicator is important to whoever added it, and the conversation becomes a negotiation between people rather than an assessment of evidence.

Sort by decision instead. Take each indicator and complete one sentence: "If this number moves, [who] will do [what] within [timeframe]." Not what it demonstrates. What it changes.

Three things happen, every time. A third of the indicators cannot complete the sentence at all, and those are the ones to retire. Another third complete it with the same answer as an indicator you already have, and those are duplicates wearing different clothes. The remainder are your system. We have run this exercise with teams who arrived convinced that every indicator was load-bearing, and watched a list of forty-odd come down to eleven without anyone arguing for the ones that went, because they had just failed to defend them in their own words.

Three traps in the sorting

  • The donor trap. Some indicators exist purely because they are in the contract and no decision hangs on them. Keep them, but separate them. Call that set compliance reporting and account for its cost honestly rather than pretending it is learning.
  • The someday trap. "We will need this for the endline." Sometimes true. Usually it means the endline design has not been written yet, and you are collecting monthly against a study you have not specified. Specify the study, then collect only what it needs.
  • The proxy trap. Three weak proxies for an outcome are not better than one. They are three chances to disagree with yourself in public.

What to do with the ones you keep

A surviving indicator earns a reference sheet: the precise definition, the numerator and denominator, the disaggregation, the means of verification, the collection frequency, the person responsible, and the decision it feeds. One page. This is the least glamorous document in MERL and the one that prevents the most expensive argument, which is two offices reporting the same indicator and meaning different things by it.

A monitoring system is not a description of your programme. It is the smallest set of questions you have agreed to keep answering.

Then give the numbers back. The strongest predictor of whether a monitoring system survives is not its design quality, it is whether the people collecting the data ever see it again in a form that is useful to them. If a field officer’s numbers vanish into a quarterly report they never read, the data quality will decline, and it will be rational of them to let it.

Tell us the decision you are trying to make.

That is the whole first conversation. Thirty minutes, free, and you will know whether we should work together.